Burj Al Arab, Dubai

Key findings

  • Existing control system (Honeywell, Wago) is defective and allows manual control only
  • No automatic function for filter backwash and filter pumps (duty and standby)
  • 50% of all sensors are defective and/or providing inconsistent readings
  • Actual control provided by HMI panels with limited functionality and no SCADA integration
Improvement workplan
  1. Starting point: Manual operation
  2. Maintenance of assets
  3. Flow control (pumps)
  4. SCADA optimization
  5. Result: 100% optimized auto mode20–25% savings