Dubai · 2021
Burj Al Arab, Jumeirah Group
Migration & Upgrade of Existing Pool Control to Simatic WinCC

Key findings
- Existing control system (Honeywell, Wago) is defective and allows manual control only
- No automatic function for filter backwash and filter pumps (duty and standby)
- 50% of all sensors are defective and/or providing inconsistent readings
- Actual control provided by HMI panels with limited functionality and no SCADA integration
- Starting point: Manual operation
- Maintenance of assets
- Flow control (pumps)
- SCADA optimization
- Result: 100% optimized auto mode20–25% savings
Get in touch
+971 4 568 6557Office address UAE
Energy Savers Technical Services LLC1103, Opal Tower, Business Bay
Dubai, UAE · PO Box 126723
Office address KSA
Energy Savers Global CompanyOffice no. 20, Building 8, Al Wurud
Olaya Street, Andalus Mall, Riyadh, KSA