Case studies

Dubai Medical University Hospital
Harmonics mitigation · Active Harmonic Filters (AHF) installation
PF 0.98 → 0.99

Emicool
Power quality analysis of chillers and pump units · Efficiency under SCADA network
COP ≤ 3.1 → ≥ 3.8 · 13–18% savings

BID Factory
Harmonics & reactive power solutions · SVG/AHF hybrid rack-mounted panel
PF 0.98 → 0.99

DP World
Harmonics & power factor solutions · SVG/AHF hybrid rack-mounted panel
PF 0.98 → 0.99

Burj Al Arab, Jumeirah Group
Migration & upgrade of existing pool control to Simatic WinCC
100% optimized auto mode · 20–25% savings

Wild Wadi, Jumeirah Group
Migration & upgrade of Siemens Desigo to Simatic WinCC
20–25% savings

Mina A’Salam, Jumeirah Group
Supply, installation & commissioning of water source heat pump plant
16% savings · 22 months ROI
Get in touch
+971 4 568 6557Office address UAE
Energy Savers Technical Services LLC1103, Opal Tower, Business Bay
Dubai, UAE · PO Box 126723
Office address KSA
Energy Savers Global CompanyOffice no. 20, Building 8, Al Wurud
Olaya Street, Andalus Mall, Riyadh, KSA