Key findings
- Hot water generation through 8 x 105kW electric calorifiers
- 60 m³ daily hot water consumption
- High energy consumption for domestic water generation
- Cold water generation through heat exchanger from chilled water system
Key solutions
- Removal of 1 calorifier, replaced by 2 water source heat pumps
- Integration of calorifiers and heat pumps with BMS for optimized use rate
- Domestic hot water generation alongside cold water generation integrated in the chilled water circuit
- Starting point: COP ≤ 1Hot water generation only
- Energy analysis of existing calorifier
- Heat pump installation
- Hot water & cold water generation
- Result: COP hot side ≥ 4; COP cold side ≥ 316% savings · 22 months ROI
Get in touch
+971 4 568 6557Office address UAE
Energy Savers Technical Services LLC1103, Opal Tower, Business Bay
Dubai, UAE · PO Box 126723
Office address KSA
Energy Savers Global CompanyOffice no. 20, Building 8, Al Wurud
Olaya Street, Andalus Mall, Riyadh, KSA